Categories
Civil Engineering

“Building for a Sustainable Future: Addressing Environmental Issues and Stakeholder Concerns in the Redevelopment of Millennium Mills” Title: “Achieving Innovation and Value for Money: A Comprehensive Analysis and Strategy for Businesses”

i need answer of this Assignment with must be in 3500 words
must include 15 pictures or flow charts
you can find on assignment guidance pdf how to do assignment for student 2 section 2 which i have uploaded below
Assignment should be based on Section 2 which is student 2 on project brief which i have uploaded below—–.
An overview of the environmental issues affecting the construction & operation of the
project.
These could include :-
Manufacture Waste
Energy usage Wild Life
Aesthetics/ design Fish
Types of materials used. Protected Species
Transportation Water Pollution
Contaminates Noise
Dust
How will any of these issues affect the design, construction, aftercare and
end of life of your structure?
Section II – Environmental & Stakeholder Management (Student 2)
2. A detailed report supporting the process in which public concerns will be addressed.
How are public concerns dealt with regarding new developments.?
Examples that could be investigated could include:-
Heathrow airport terminal 5
Thames Barrier.
Cross Rail
A new housing development
Where do Town and Country Planners fit into all of this?
Section II – Environmental & Stakeholder Management (Student 2)
3. Evaluate how Low Carbon Planning helps to integrate energy efficiency and renewable
energy sources cost effectively into the new development. (e.g. identify the measures used
to minimising construction waste, embodied energy and carbon emissions, in low carbon
energy design and planning)
You will need to consider the following:-
• Low Carbon planning
• What are renewable energy sources
• How will construction waste be reduced
• How does embodied energy affect the manufacturing process then the carbon foot print?
• How did you consider a low carbon design for your project?
Project Brief – The Millennium Mills Redevelopment Cities across the world are already feeling the effects of the climate crisis and need to ensure that they are resilient to a future which could result in a variety of changeable weather, such as more powerful rainfall events, higher temperatures and sea level rise. This means that all new developments need to be designed to be resilient in an uncertain world in 2050 to ensure that the people living, working and visiting there are safe, healthy, comfortable and productive. Silvertown Quays in London’s Royal Docks is a waterside site which will be developed over the next 10-15 years and needs to be designed to be 2050- ready. The client has already received several proposals regarding the refurbishment of the Mills but remains unsatisfied with these proposals. Details of the context and background to the Millennium Mills can be found in Appendix A. Your team is an engineering consultancy company and has been commissioned by the lead developer Lendlease to carry out a feasibility study and outline design for the redevelopment of the Millennium Mills located on the southern side of the Royal Victoria Dock and associated infrastructure. You will be considering plot 4 for the construction of a new building to facilitate the client’s requirements below. Basic details, and site plans are provided on the Moodle site for EG7034 – with further documentary details and materials accessed online from the Newham London Borough Planning Portal. Access details of which are in Appendix B. Project requirements Lendlease is looking to you for answers as to how to achieve from the project the most appropriate: • Sustainable approach to design that will provide long term benefit to the local and wider area of East London. • An integrated infrastructure strategy and improved access and transport links for the local people and businesses. • A strong commercial strategy & evidence that the development with be financially viable and meet its legal requirements. • Demonstrate that they meet the needs of local and regional stakeholders and environmental planning obligations • A clear procurement strategy and safe construction programme 5 • A high-quality development that showcases innovation and also provides value for money for the client and stakeholders alike. This is broken down in more detail into five (I – V) sections in Part B of this assignment.

Categories
Civil Engineering

“Designing for a Sustainable Future: Addressing Environmental Issues and Stakeholder Concerns in the Redevelopment of Millennium Mills” “Maximizing Value: Delivering Cost-Effective Solutions for Clients and Stakeholders”

Assignment must be in 3500 words
must include 15 pictures or flow charts
you can find on assignment guidance pdf how to do assignment for student 2 section 2 which i have uploaded below
Assignment should be based on Section 2 which is student 2 on project brief which i have uploaded below—–. An overview of the environmental issues affecting the construction & operation of the
project.
These could include :-
Manufacture Waste
Energy usage Wild Life
Aesthetics/ design Fish
Types of materials used. Protected Species
Transportation Water Pollution
Contaminates Noise
Dust
How will any of these issues affect the design, construction, aftercare and
end of life of your structure?
Section II – Environmental & Stakeholder Management (Student 2)
2. A detailed report supporting the process in which public concerns will be addressed.
How are public concerns dealt with regarding new developments.?
Examples that could be investigated could include:-
Heathrow airport terminal 5
Thames Barrier.
Cross Rail
A new housing development
Where do Town and Country Planners fit into all of this?
Section II – Environmental & Stakeholder Management (Student 2)
3. Evaluate how Low Carbon Planning helps to integrate energy efficiency and renewable
energy sources cost effectively into the new development. (e.g. identify the measures used
to minimising construction waste, embodied energy and carbon emissions, in low carbon
energy design and planning)
You will need to consider the following:-
• Low Carbon planning
• What are renewable energy sources
• How will construction waste be reduced
• How does embodied energy affect the manufacturing process then the carbon foot print?
• How did you consider a low carbon design for your project?
Project Brief – The Millennium Mills Redevelopment Cities across the world are already feeling the effects of the climate crisis and need to ensure that they are resilient to a future which could result in a variety of changeable weather, such as more powerful rainfall events, higher temperatures and sea level rise. This means that all new developments need to be designed to be resilient in an uncertain world in 2050 to ensure that the people living, working and visiting there are safe, healthy, comfortable and productive. Silvertown Quays in London’s Royal Docks is a waterside site which will be developed over the next 10-15 years and needs to be designed to be 2050- ready. The client has already received several proposals regarding the refurbishment of the Mills but remains unsatisfied with these proposals. Details of the context and background to the Millennium Mills can be found in Appendix A. Your team is an engineering consultancy company and has been commissioned by the lead developer Lendlease to carry out a feasibility study and outline design for the redevelopment of the Millennium Mills located on the southern side of the Royal Victoria Dock and associated infrastructure. You will be considering plot 4 for the construction of a new building to facilitate the client’s requirements below. Basic details, and site plans are provided on the Moodle site for EG7034 – with further documentary details and materials accessed online from the Newham London Borough Planning Portal. Access details of which are in Appendix B. Project requirements Lendlease is looking to you for answers as to how to achieve from the project the most appropriate: • Sustainable approach to design that will provide long term benefit to the local and wider area of East London. • An integrated infrastructure strategy and improved access and transport links for the local people and businesses. • A strong commercial strategy & evidence that the development with be financially viable and meet its legal requirements. • Demonstrate that they meet the needs of local and regional stakeholders and environmental planning obligations • A clear procurement strategy and safe construction programme 5 • A high-quality development that showcases innovation and also provides value for money for the client and stakeholders alike. This is broken down in more detail into five (I – V) sections in Part B of this assignment.

Categories
Civil Engineering

“The Curvature of Level Surfaces: Examining the Use of Horse Piped Water in Construction Leveling”

Level surfaces are curved surfaces tangential to the horizontal plane at that point. Are horse piped water used in construction leveling perfectly Level?

Categories
Civil Engineering

“Procurement Methods and Supply Chain Management in Civil Engineering Construction: A Case Study of the Millennium Mills Redevelopment Project” Meeting Legal Requirements and Stakeholder Needs in Construction Projects: A Case Study of a High-Quality Development

Assignment must be in 3500 words
must include 15 pictures or flow charts
Assignment should be based on Section V – Procurement Methods and Supply Chain Matters (Student 5)
1.Select & justify the most appropriate procurement method for this project in terms of the contractual
obligations. Explore the implementation of the innovative collaborative procurement approach to derisk the construction.
What does procurement mean?
Procurement is the process of purchasing goods or services. There are many different routes by which
the design and construction of a building can be procured:-
Traditional
Design and Build
Partnering- and so on
Form of Contract :-
JCT
ICE 7th Edition
NEC suit- and so on.
How would a collaborative approach de-risk the construction.
Section V – Procurement Methods and Supply Chain Matters (Student 5)
2. Analyse the structure of the UK economic in terms of procurement methods & supply chain
matters and demonstrate a critical awareness of the economic role played by the civil engineering
construction industry.
Similar to the last question but centred around UK policies.
Can you reflect on any past companies where the wrong procurement methods have been used?
What is Supply Chain Management?
Who are the parties to it
What are the benefits of it.
How does Civil Engineering play an economic role within the system?
Would a flow- chart support this section?
Section V – Procurement Methods and Supply Chain Matters (Student 5)
3. Describe how Quality Assurance System ensures the best practice in managing the construction
of the development. Propose practical measures that can be utilised by contractors to ensure that the
client achieves a project that is ‘fit for purpose’ and best value for money’.
What is quality assurance.?
What is:- ISO9000 and ISO9001
How will quality be managed on this project .
Will a flow chart assist this question.
How do you achieve a project that’s fit for the purpose?
How do you achieve Best Value for money or best value best practice.
Project Brief – The Millennium Mills Redevelopment
Cities across the world are already feeling the effects of the climate crisis and need to
ensure that they are resilient to a future which could result in a variety of changeable
weather, such as more powerful rainfall events, higher temperatures and sea level rise.
This means that all new developments need to be designed to be resilient in an uncertain
world in 2050 to ensure that the people living, working and visiting there are safe, healthy,
comfortable and productive. Silvertown Quays in London’s Royal Docks is a waterside site
which will be developed over the next 10-15 years and needs to be designed to be 2050-
ready.
The client has already received several proposals regarding the refurbishment of the Mills
but remains unsatisfied with these proposals. Details of the context and background to the
Millennium Mills can be found in Appendix A.
Your team is an engineering consultancy company and has been commissioned by the
lead developer Lendlease to carry out a feasibility study and outline design for the
redevelopment of the Millennium Mills located on the southern side of the Royal Victoria
Dock and associated infrastructure. You will be considering plot 4 for the construction of a
new building to facilitate the client’s requirements below. Basic details, and site plans are
provided on the Moodle site for EG7034 – with further documentary details and materials
accessed online from the Newham London Borough Planning Portal.
Access details of which are in Appendix B.
Project requirements
Lendlease is looking to you for answers as to how to achieve from the project the most
appropriate:
• Sustainable approach to design that will provide long term benefit to the local and
wider area of East London.
• An integrated infrastructure strategy and improved access and transport links for
the local people and businesses.
• A strong commercial strategy & evidence that the development with be financially
viable and meet its legal requirements.
• Demonstrate that they meet the needs of local and regional stakeholders and
environmental planning obligations
• A clear procurement strategy and safe construction programme
5
• A high-quality development that showcases innovation and also provides value for
money for the client and stakeholders alike.
This is broken down in more detail into five (I – V) sections in Part B of this assignment.

Categories
Civil Engineering

“Water Resource Planning and Management in the Coastal Bend (N) Regional Area of Texas: A GIS Approach to Flood Risk Assessment and Climate Change Impact Assessment”

Plz, do not accept the question if you don’t use ArcMap
I need someone who is an expert on Water Resource planning and ArcMap GIS software.
to
Make a Report and PowerPoint presentation for a project.
Project Name: “Water resource planning and management in the Coastal Bend (N) Regional area of Texas with a focus on flood risk assessment and climate change impact assessment”
All the information and description you need are in the attached files (please read the Word file Report template carefully) (And the PDF files for Data reference)
Make a Report and PowerPoint presentation
use ArcMap GIS Software for flood risk assessment And impacts of climate change on water resources in the Coastal Bend (N) Regional area.
Data https://drive.google.com/file/d/1ArR9XiC5FCYHdWew6…

Categories
Civil Engineering

Title: Selection and Comparison of Devices for Seabed Sampling and Geotechnical Testing in Different Marine Environments

Recommend the most suited device to (i) collect a seabed surface sample, (ii) collect a sediment core, and (iii) conduct in-situ geotechnical testing of the seabed for the following conditions. Regarding (iii), comment on expected penetration depths. Sandy nearshore environments with significant currents and waves.
Estuary with mostly muddy to silty sediments, significant tidal currents, negligible wave action.
Deep ocean environments with water depth > 500 m.
There are no prior information available about the site.
Draw a conceptual sketch of a CPT including sensors and deployment mechanism. Describe step by step how to calculate undrained shear strength from CPT testing. Discuss pros and cons of CPT versus FFP testing.

Categories
Civil Engineering

Teen Traffic Safety in Hillsborough County: Analyzing Crash Data and Identifying High-Risk Areas Slide 1: Title Slide – Teen Traffic Safety in Hillsborough County: Analyzing Crash Data and Identifying High-Risk Areas Slide

Hillsborough County School Board would like to establish a new traffic safety initiative to improve teen
driver safety in the county. You are assigned to analyze teen traffic crash data (2015‐2019) and present your findings with maps. Your presentation (ppt) should include as a minimum the following components:
Explain your data and process to develop maps.
Map(s) to show the frequency of teen crashes by high school boundaries (district) in Hillsborough County
Map(s) to show the annual change in teen crashes at the school district level between 2015 and 2019 in Hillsborough County
Map(s) to show the proportion of the low-income population (census tract level) by high school boundaries and discuss the relationship between income and the frequency of teen crashes
Select one school and develop maps to show teen crashes around the school (Draw a boundary of the selected school and buffer). Investigate crash frequencies based on the distance from the school. Distance as measured by a straight line. (Less than a quarter of a mile, half a mile, a mile…)
Discuss your findings
Final submission will be a ppt (No more than 20 slides including title page)
Add speaker notes to each slide (what you’re going to say to present)

Categories
Civil Engineering

Optimizing Intersection Safety: Mast Arm Locations and Design for Hanna Avenue Project

please create a slides covering the firts 2 bullet point of the assignment:
Identify the locations of mast arms for traffic signals at the intersections in your project scope.
If there is no mast arm, propose a mast arm option for an existing traffic signal structure.
i have uploaded our ppt project ( Hanna avenue) please use it and add the slides to it or use same template.
I have also uploaded a sample slides from another project from previous semester.
consider incorporating similar elements:
1. **Visual Representations**: Include diagrams or photos that give a clear view of the current intersection layout and where the mast arms would be placed.
2. **Data Tables**: Present traffic data and any calculations that support your proposed locations for the mast arms.
3. **Design Details**: Provide specifications for the mast arm designs, referencing FDOT standards and guidelines.
Here are the resources:
Drilled Shaft
FDOT Structures Manual
–Volume 1 – Structures Design Guidelines (Based on AASHTO LRFD Bridge Design Specifications)
–Volume 3 – FDOT Modifications to LRFD Specifications for Structural Supports For Highway Signs, Luminaires and Traffic Signals (LRFDLTS-1)
https://www.fdot.gov/structures/structuresmanual AASHTO LRFD Bridge Design Specifications (8th edition, 2017)
https://app.knovel.com/kn/resources/kpAASHTO94/toc…
FDOT Design Manual
https://www.fdot.gov/roadway/fdm/default.shtm
FDOT Soil and Foundation Handbook (2021)
https://www.fdot.gov/structures/docsandpubs.shtm FDOT Program “StandardMastArm v1.6” in Excel for Design Aid for FDOT Standard Mast Arm Assemblies (Standard Plans Index 649-030)
https://www.fdot.gov/structures/proglib.shtm
FDOT Program “Drilled Shaft v1.1” in Mathcad 15 for analyzing overturning and torsion in drilled shafts in accordance with AASHTO LRFD LTS Design Specification
https://www.fdot.gov/structures/proglib.shtm
PTC Mathcad (Free for 30 days)
https://www.mathcad.com/en/education

Categories
Civil Engineering

Adapting Foundation Engineering Practices to Mitigate the Effects of Climate Change: A Case Study Using MIDAS GTS NX Software

I need someone who is an expert on Foundation Engineering and MIDAS GTS NX Software To Make a Word file Report and PowerPoint presentation for a project.
Project Name: “Influence of Climate Change on Foundation Engineering Practices”
All the information and description you need are in the attached Word file (please read the Word file carefully)
Make a Report and PowerPoint presentation
Use MIDAS GTS NX Software for Slope stability analysis

Categories
Civil Engineering

Exploring Alternative Construction Contract Options for Transportation Projects in San Diego Introduction: The Design-Bid-Build (DBB) method has been the traditional approach for construction contracts in the transportation sector. However, with the increasing complexity and cost of

Design-Bid-Build is the typical construction contract process for most of Transportation Projects. It required complete Design set, time to bid the project (3-6 months), then start of construction.
Can you discuss other construction contract options that we are using in San Diego (Design-built, etc.)?